Documents
Closure
Red-Hills-Closure-Plan_Signed_2016.10.141
Red-Hills-Post-Closure-Plan_Signed_2016.10.14
Groundwater
Choctaw-Gen_CCR-2023-Annual-Report_2024.01.16
Adjacent-landowner-notification-to-MLMC
CGLP-Notification-of-SSL-for-Beryllium_20190618
CG_2nd-Notification-of-SSL-for-Beryllium_202020.05.07
Choctaw-Gen_CCR-2022-Annual-Report-PKG_2023.01.18
Choctaw-Gen_CCR-GWM-2021-Annual-Report-PKG_2022.01.25
Choctaw-Gen_CCR-GWM-2020-Annual-Report-PKG_2021.01.26-2
Choctaw-Generation_CCR-Annual-Report-Notification-Letter_2023.01.31
Choctaw-Generation_Corrective-Measures-Assessment_2019.07.16
Notice-of-Initiation-of-Corrective-Measures-Assessment_2019.01.30
Red-Hills-Plant-2019-Annual-CCR-GW-Report
Red-Hills-Power-Plant-_CCR-GW-Annual-Report-20190130
Red-Hills-Power-Plant_CCR-GW-Annual-Report_Signed_20180129
Red-Hills-Power-Plant_CCR-GW-Monitoring-Plan_Signed_2016.10.14-superceded
Red-Hills_CCR-GW-Monitoring-Plan_2019.1.29
Red-Hills_Notification-of-SSL-Above-Groundwater-Protection-Standard_2018.10.29
Inspections
2015-CCR-Annual-Inspection-notificaiton
2015-CCR-Annual-Inspection-Report
2016-CCR-Annual-Inspection-Report
2017-CCR-Annual-Inspection-Report
2018-CCR-Annual-Inspection-Report
2019-CCR-Annual-Inspection-Report
RedHills_AnnualInsp_Report2022
rpt_AnnualInspection_RedHillsAMU_2021-12
20191219_AnDstRep_RED_AMU_FINAL
20240108_RedHills_AnnualInsp_Report2023-1
Location
20181016_Red-Hills_CCR-Unstable-Areas-Report
Operating Criteria
20161219_AnDstRep_RED_AMU_FINAL
20171219_AnDstRep_RED_AMU_FINAL
20180831-Red-Hills_Notification-of-Assessment-Monitoring
20181219_AnDstRep_RED_AMU_FINAL
20191219_AnDstRep_RED_AMU_FINAL
20201218_AnDstRep_RED_AMU_FINAL
20211015_AnDstRep_RED_AMU_FINAL
20211015_AnDstRep_RED_AMU_FINAL
Choctaw-Gen_ASD-Notification_2020.08.24
Choctaw-Gen_CCR-GWM-2020-Annual-Report-PKG_2021.01.26
Choctaw-Gen_Notification-of-Change-in-CCR-Monitoring_2020.03.23
Choctaw-Generation-ASD-Revision-20200820